HOME / THE FLEET / POSI-TRACKS

Posi-track hire.

Five ASV posi-tracks, RT60 through to RT75, wet or dry, across Perth and regional WA. Low ground pressure for soft and wet ground, a small footprint for tight access, and maintained in-house by our own mechanics.

5 POSI-TRACKS · RT60 TO RT75

The posi fleet.

Three sizes on the same idea. Rubber tracks, low ground pressure, and a footprint that fits where a wheeled machine will not.

Posi-track marks pressed into soft ground
RT60
ASV RT60 Posi-Tracks
ASV RT60
Compact tracked power for soft ground and tight access.
2
UNITS
P16 to P17
→
ASV RT-65 posi-track working on soft ground
RT65
ASV RT-65 Posi-Tracks
ASV RT-65
Mid-size posi with attachments to suit the job.
2
UNITS
P18 to P19
→
The Platinum crew on site with a water truck, two wheel loaders and a posi-track
RT75
ASV RT75 Posi-Track
ASV RT75
The big posi for production work on bad ground.
1
UNIT
P20
→

Why a posi and not a skid steer?

It comes down to what the machine does to the ground it is standing on.

Ground pressure is the whole point.

Rubber tracks spread the machine's weight over a far bigger area than wheels do. On soft sand, wet clay or a freshly trimmed pad, a posi keeps working and keeps the surface intact where a wheeled machine digs in and churns it up. On a wet Perth winter site that is often the difference between working and standing around.

It gets in where the excavators cannot.

Narrow side access, between buildings, and onto tight infill blocks. Tracks plus a compact footprint means you can work a backyard or a small lot without taking a fence out to get in.

Which of the three?

RT60 for the tightest access and lighter work. RT-65 is the mid-size all-rounder and the one most jobs end up on. RT75 when you want production rate and the ground is genuinely bad. If you are not sure, tell us the access width and the ground conditions and we will pick it for you.

Attachments.

The posis run a range of attachments depending on the job. Tell us what the work involves when you request a quote and we will confirm what is available for the dates you need.

Posi-track hire questions.

The things people ask before they book.

Do I need a ticket to operate one?

For dry hire your operator needs to be competent on the machine class and able to show evidence of it, which on most sites means a verification of competency. If that is a problem, take it wet and one of our operators runs it for you.

Wet or dry?

Both. Wet hire includes one of our licensed operators. Dry hire is the machine only, floated to site, for crews who are already set up to run it.

Will it damage a finished surface?

Far less than a wheeled machine, which is the main reason people choose one. Rubber tracks spread the load, so a posi crosses lawn, sand and trimmed pads with much less disturbance. It is not zero impact though, so tell us what the surface is and we will give you an honest answer before it turns up.

Can you get one onto a tight residential block?

Yes, and it is one of the most common jobs these go to. Send through the access width and any gate or slope constraints when you enquire, and we will confirm which of the three fits before anything leaves the yard.

Working on soft or tight ground?

Tell us the access, the ground conditions and the dates. You will get a complete quote back, usually the same day.